This article is more than 5 years old.
On Monday Barry re-assembled the equipment in the Multi-media lab following a several week-long refurbishment of the space.
The lab has been re-configured just a bit to make better use of the space but everything else is pretty much as it was. Shortly though we will be installing a brand-new digitization machine procured as with Grant funds from our recent LSTA Outreach grant.
Come on down and check out the new carpet, new ceiling and re-painted (I promise) walls!